Coastal Protection Works Completed in Jesolo Pineta

Works have been completed in Jesolo Pineta (Venice), along the stretch between the “Bellevue” and “Maracaibo” groynes.

The intervention involved the rehabilitation of hydraulic defense structures, with a particular focus on the modification of the stone barriers. The heads of the groynes were redesigned with a “Y-shaped” configuration, a technical solution developed to dissipate wave energy and encourage the natural accumulation of sediments. A targeted intervention aimed at counteracting coastal erosion phenomena that, over time, have progressively reduced the width of the beach.

ITS Engineering Company – Safety Coordination during the execution phase.

The images show some construction phases and temporary configurations of the intervention.